 |

The Maintenance of Cement Mill |
|
Submitted by ballmill
| RSS Feed
| Add Comment
| Bookmark Me!
The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
Click for Details --> http://www.ballmill8.com <--
|
|
 |

|
LinkedIn Recommendation:
Lois Livingston - php Developer at Paratsee - I'm working with Teo on learning new Internet Marketing tips and tricks for my business. He's got a great grasp of just what I need to know, is really fun to work with and although I don't really like to talk on the phone, Teo makes phone conferences really worth the time. I get stuff out of those that aren't anywhere else on his eWorkshopCourses.com site, or the IBC site. If you are looking for a real GURU, Teo is that guy! - March 17, 2012, Lois was Teo's client |
|
Featured [ball mill] Articles:
|
 |