The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
Click for Details --> http://www.ballmill8.com <--
|
|
 |

|
|
LinkedIn Recommendation:
Lana Cicen - Project Coordinator at The Hope Financial Services, Inc - I had Teo help with my non-tech project I was working, which was a triage system for a construction company - all paper. Teo made it work more efficiently and explained how the new system could be upgraded into a computer program, which included inventory management online. I love this guy! Always one step ahead. I just hired him again make this our phase 2 project. If you are looking for a process guy, Teo is it! - March 17, 2012, Lana was Teo's client |
|
Featured [ball mill] Articles:
|
 |