The Maintenance of Cement Mill |
|
Submitted by ballmill
| RSS Feed
| Add Comment
| Bookmark Me!
The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
Click for Details --> http://www.ballmill8.com <--
|
|
 |

|
LinkedIn Recommendation:
Jonah William - Owner at Tessier Marketing - I thought I was well versed in social media before I found Teo. He has helped me round my skill set with great information only he seems to teach. I went on the web and looked for it later, but it's just not there. The ShareThis.com counters for instance, which definitely don't work right... can't find that anywhere, but it's easy to prove once you know what to test for! Teo really has a way of getting to what works and what works best! - March 17, 2012, Jonah was Teo's client |
|
Featured [ball mill] Articles:
|
 |