The Maintenance of Cement Mill |
|
Submitted by ballmill
| RSS Feed
| Add Comment
| Bookmark Me!
The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
The maintence and repair are key regular job, which can guarantee the good performance of Cement Mill and security of ourselves.
1.Pay close attention to temperature change in sliding shoe bearing bush.
2.Pay close attention to wear degree and fracture of wearing parts and timely change it.
3.Check sliding shoe bearings lubrication system operating condition, fuel feeding regularly.
4.When refuel and renew the oil in winter, heat oil to 25 centigrade or so, deterioration or not clean lubrication are not permitted.
5.For the using and new replacement bearingbush, after one month operating, lubrication shall be all released through clean and replacement.
6.Always check the cooling system and ensure unblocked.
7.Check incoming and outgoing material sealing condition, if which were weared seriously or affected, adjustment and replacement or other measurement shall be adopted.
8.Check and ensure each lining board link bolt, foundation bolt and so on without looseness, fracture and abscission.
9.If htere's any abnormal vibration and noise occur to any part, cement mill should be immediately stopped and check. 10.The deformed parts caused by thermal expansion and temperature rise should be solved timely.
Get ball mill,beneficiation,Mineral Processing From http://www.ballmill8.com
Click for Details --> http://www.ballmill8.com <--
|
|
 |

|
|
LinkedIn Recommendation:
Kay Nikookary - Marketing and Brand Specialist - Information Architect! What a perfect title for the man that knows so much about technology, execution, business strategy and how to put it all together to make huge strides for your organization. I have seen Teo at work and would recommend him to anyone seeking a dynamic speaker on the diverse and complex topic of technology, I would recommend Teo to anyone starting or restructuring their company to take advantage of technology and tap into the global marketplace. He is the ideal consultant, speaker, project leader! Teo is one of those rare gems that knows IT and can truly be the architect of your system; and yet explain it you, and others like me, that don't always understand or want to know the technology side of the picture. He is a very personable gentleman who knows his stuff and if you are considering a technology question, then you need to at least have a conversation with him - because he WILL add value for you! - August 17, 2008, Kay was Teo's client |
|
Featured [ball mill] Articles:
|
 |